resume

Not in love with this template? Browse our full library of resume templates

boy

Build your resume in 15 minutes

Use professional field-tested resume templates that follow the exact resume rules employers look for.
1

process engineer

  •  Production-planning supervision, scheduling for production, preparing production schedules for manufacturing of industrial or commercial products.
  • Making sure each operation meets shipping dates according to sales forecasts or customer orders.
  • Analyzing production specifications and plant capacity data and performs mathematical calculations to determine manufacturing processes, tools, and human resource requirements.
  • Planning and scheduling workflow for each department and operation according to previously established manufacturing sequences and lead times.
  • Planning sequence of assembly, installation, and other manufacturing operations for guidance of production workers.
  • Preparing production reports.
  • Plans the process for manufacture, fabrication, assembly, erection or installation of parts, components, assemblies, etc.
2

process engineer

  • Coordinated various procedures of machined product.
  • Guided the production team members .
  • Design detailed dimensional drawings and distribute to production and management. 
  • In charge of the first article (FA) projects of company.
  • Implement the corrective actions to every product or complaint from customer.
  • Analysis of operational issues and installation of new equipment.
  • Involve in R&D of the production site.
3

process engineer

  •  Make a cost reduction project to reduce Cost Of Production for old model which still running in Shimano. Had reduced for cutting process for inner wire department. Get saving RM5,000.00 per month through reduce the machine breakdown time. 
  • Increase monthly output 10% for cable output by increase machine capacity. Add RM33,000.00 for the monthly as the profit. 
  • Join Small Group Activities, where every group is has maximum 3 people to tackle small problem to make a medium impact in department revenue. This activities focus on NC product and everyone will discuss together and solve that problem in 2 weeks. 
  • Act as Project Manager when company need invest for new machine. Study about new machine, new machine capability, deal with supplier, make proper schedule, present to top management, make new layout for machine position, run testing for new machine, make FA and quality study for comparison. 
  • Make Process Control Plan, Work Instruction and come out Check sheet base on drawing. 
  • Train operator for run new machine. 
  • Run testing for new model, collect data and analysis (using mini tab). Share all the data during presentation. work together with other department with all level worker. 
4

process engineer

  • Resolves problems utilizing acquired knowledge & analytical abilities. 
  • Interact with customers for reject item issue.
  • Improve any NC to save cost and reduce the cost of production. 
  • Study with other engineer to increase machine capability and reduce the cycle time. 
5

process engineer

  • Establish Process Work Instruction and Standard of Procedure for each process follow safety requirement.
  • Control process flow and troubleshooting problem.
  • Conduct trial run before proceed to commercial run.
  • Improve job method to increase productivity and machine efficiency.
  • Train operator understanding about job method and job instruction.