Senior Civil Engineer Resume Examples

senior civil engineer

  • Supervision of the implementation of the safety requirements in the factories of the Industrial Cities Authority in Dammam.
  • Review all the engineering drawings for the project and the special and general requirements and detection of conflicts and problems related to implementation and work to resolve them in coordination with all concerned authorities.
  • Raise all the daily, weekly and monthly reports to the senior management to update the project status hence report it to the owner.
  • Check all contractor works at the site according to drawings and specifications and give instructions.
  • Review all the quantities implemented at the site to get the contractor invoice.

senior civil engineer

  • Total area of construction 294000 sqft
  • Inspection and checking of elevations, as per approved plan. 
  • Prepare a request for inspection and checklist in accordance with approval inspection technical procedures prior to commencing work. 
  • Execute work on site is carried out according to specifications/ drawings. 
  • Executions of civil, interior and exterior ground finishing work.   

senior civil engineer

  • Total Area: 32000 Sq.ft o    Residential Project
  • Checking form work, reinforcement and concrete. 
  • Ensuring that all work is done without wastage of materials. 
  • Supervision of whole work site and solve an expected problem in site. 
  • preparation of site work schedule .

senior civil engineer

  • Total Area: 108000 sq.ft. 
  • Preparation of weekly monthly progressive meetings slides and attend meeting with the consultant .
  • Supports quantity surveyors (in projects) in verifying progress, payments, and claims.
  • Assist in planning and development of resources such as manpower and material .
  • Supervision of all construction activities including concrete works . 

senior civil engineer

  • Total Area: 258240 sfts.
  • Coordinate with subcontractor for smooth flow of work .
  • Inspection and testing materials prior to their use at site as per sample approve by consultant and ensure reject of material from site 
  • OSHA Safety compliance.
  • Coordinate with engineer and architecture clients.
  • Documentation and site management 

senior civil engineer

  • The total area of construction 65000 sqft Classrooms are foam finishing work 
  • Reviewed plans and specs during the schematic design of pre-construction. 
  • Preparation of work planning schedule, material requisition, and documentation.
  • Estimated quantities and materials, equipment, and labor to determine project feasibility.
  • Billing with measurement checking as per the given drawing. 
  • Prepare weekly and monthly progress reports.
  • site control and execution of all site work. 

senior civil engineer

  • Industrial Project (D.G.room, S.T.P ) 
  • The witness of backfilling, earthwork, concreting. 
  • Ensure that all work meets the stipulated quality and standard. 
  • The monitoring daily progress of the site. 
  • Tactical planning 

sr. civil engineer

  • Working on the Project of Agra Smart City as A Site Engineer
  • Miner Road Construction is done.
  • Coordinate with subcontractors and suppliers for work progress.
  • Identify the problems and improve work progress. 

senior civil engineer

  • Civil work activities.
  • Electrical & Electromechanical work activities.
  • RF work (Radio frequency installation activities).
  • Acceptance and audit for all work activities.
  • Revising sites Bill of Quantity (BOQ) and billing.
  • Following up the sites from acquisition phase and Design Sheets (DS) preparation.
  • Communicating with Telecom Deployment (TD) team for site preparing.

senior civil engineer

  • Directed staff assigned to the project by organizing, delegating, instructing and monitoring assignments. 
  • Evaluated contractor’s methods of construction, equipment, work schedules, and assure compliance with contract and specifications. 
  • Review and monitor freeway work zone safety. 
  • Interpret project plans, and adjust to fit field conditions. 
  • Run and participate in meetings with internal and external customers. 
  • Document project construction activities and quantities including preparation of contract modifications. 
  • Manage project estimates, diaries, and status in Field Manager/FIT/MIT systems.