Piping Supervisor Resume Examples

piping supervisor

  • Obtaining work permits based on scheduled daily activities.
  • Monitoring & Controlling installation activities of Pipe Spools.
  • Submitting daily progress summary.
  • Maintaining safety protocols of Live equipment and devices.
  • Monitoring & controlling heavy vehicle movements.
  • Preparing test packages for the completed lines.
  • Ensuring proper, safe work area & maintaining the workplace quality.

piping supervisor

  • Monitor and supervised contractor installations, erections and testing of spools and prepare status of works based on the daily output.
  • Provide technical support to the contractor in advance to maintain quality work and schedule.
  • To ensure that safety remains the main priority on the construction site at all times.
  • Direct or coordinate activities of engineering or technical personnel involved in designing, fabricating, modifying, or testing and erecting Mechinery

piping supervisor

  • Ensure that all subordinates are trained and knowledgeable of specifications and work procedures and that work are being performed in conformance with specified quality requirements.
  • Play an active role in the development of the safety culture on the project, making safety a natural part of all work performed.
  • Site supervision pertaining to structural and piping erection as per design and specifications.
  •  Plays a leadership role in the development of the safety culture on the project, making safety a natural part of all work performed
  • Oversee the daily construction activities at work site, including scheduling of workers, delivery of equipment and materials, and progress of the project
  • High focus on ensuring that all aspects of the construction work are performed safely
  • Performs work in conformation with plans, specifications, schedules, and cost control estimates

piping supervisor

  • Planning and scheduling construction activities as per sequential and priority basis from site mobilization stage.
  • Supervise the laying and joining of underground pipeline (size 16,24,48,64 inches)
  • Man power control and forecast, distribute the duties and coordinate among various disciplines and monitor the workmanship. Lead the entire team to achieve the progress as per schedule
  • After completion of fit up arranging for QC inspection and third party inspection according to approved ITP.
  • Study the P&ID and preparing complete Test package including check list and all applicable reports (Identifying system & testing limits as per piping class/design & materials). Identifying of Test pressure.
  • Conducting line walkthrough with client after mechanical completion of line. Coordinating with field engineers to clear the punch points before pressure test.
  • After completion of Hydro-testing, involving in pre-commissioning activities. Witness Air Blowing, preservation activities and Flange management

piping supervisor

  • Maintain daily supervisory surveillance checks and records ensuring that contractor management and supervision are providing safe working conditions
  • Monitor and supervised the contractor installations, erections and testing of spools and prepare status of works based on the quality output.
  • Manage the performance of employees through goal setting, ongoing assessment, and coaching
  • Change/scope creep, ensuring that all scope changes are quickly and properly documented, and that change orders are approved prior to the performance of work

piping supervisor

  • Preparation of hydro test packages within the time period
  • coordinated with client to finish the hydro test 
  • led the crew & finished the MC punch list
  • Executed the work as per the approved method statement,drawings,procedure etc,
  • Applied the permit to work (JOB PERFORMER) system to complete the task in a safe manner.  

piping supervisor

  • Support the project management to complete the piping works in scheduled time with safe manner.
  • Ensuring all the piping works is being done as per project specification and standards.
  • Monitoring subcontractor’s day to day activity and work progress. Coordination with fabrication shop and painting shop for priority pipes and spools.
  • Review and checking the piping isometric and P&ID. Spool releasing and material traceability. Preparation of material requirement sheet.
  • Conducting toolbox talk on daily basis at work spot. Identified the hazards in the work field and take precautions to eliminate the hazards.
  • Attending walkthrough with construction management and conforming the rectification of their comments.
  • Prepare daily, weekly and monthly progress reports and issue them to chief supervisors. Attend daily, weekly and monthly meeting with client and managers.

piping supervisor

  •  Planning, Execution, Control and Supervision of all activities like Test pack and Test equipment preparation.
  • Planning, Execution, Control and Supervision of all activities like Pneumatic testing, Hydro testing, Watering, Dewatering, pressurizing, Depressurizing etc of pipeline of different material like, SS, CS(Corrosion resistance alloy lined/cladded inside),LTCS, Nickel alloy and GRE carrying hydrocarbon at high pressure range, in compliance with Project specification, International codes and Project HSE plan.
  • Communicates and interfaces with other engineering disciplines, Coordination with Pipe engineers, QA/QC and HSE team in the organization and those of client for related activities.
  • Attending/generating punch points as a part of mechanical completion activities. Confirm there are no category A punch list items.
  • Monitor work permit issuances and check strict implementation of all safety requirements during testing & pre-commissioning works.
  • Review of Hydrotest Package and check the limit of test pack.
  • Confirm all valves are set to the pre- test position shown in the system P&ID limits.

piping supervisor

  • Isolation Hand Valves have been set in positions specified by the checklist prior to the test.
  • Verify that all instruments have been installed, tested and connected.
  • Check pipeline hangers and supports for any damages and possibility for movement on sliding supports.
  • All necessary blinds have been installed as per isolation plan. Confirm all spectacle blinds and temporary commissioning spades are in the pre-test position shown in the system P&ID limits.

piping supervisor

  • Ensure direction and location of check valves do not interfere with pressuring or depressuring the system.
  • Do line walk and final inspection in preparation for testing.
  • Execution and inspection on hydrotest, pneumatic test and leak test.
  • Check flange connections for leaks, if leaks are found, bleed off pressure, repair the leaks, and build up pressure again.
  • Reinstall package and submit to pre-commissioning and commissioning activities.
  • Identify restrains on the progress of pre-commissioning work in order to provide timely resolution and/or to minimize disruption.
  • Review mechanical completion packages. Prepare pre-commissioning and commissioning schedules as per system priority based on commissioning matrix.