Scaffold Builder Resume Examples

scaffold builder/painter/concrete mason

  • Erect and disassemble scaffolding
  • Coordinate and plan alongside other contractors
  • Maintain clean and safe work environment
  • Operate hand tools such as grinders, sandblasters, and spray rigs.
  • Cleaned and painted pipes, handrails, and guardrails.
  • Build and disassemble concrete forms.
  • Mix, pour, and finish concrete.

scaffold builder

  • Tear down and build scaffolds for contractor needs
  • Heavy lifting, work effectively in teams, prepare jobs, make sure job sites clean, working safely and efficiently, prepare Job Safety Analysis paperwork.
  • Obtained training in confined spaces and 100% fall protection
  • Handle the tasks of cleaning work areas and equipment to maintain a clean and safe jobsite
  • Able to recognize hazards and find ways to mitigate those hazards.
  • Deal with paper work such as filling out JSA’s, which is use to describe the job being done in procedures and including safety hazards on job site.

scaffold builder

  • Determined amount of materials, identified appropriate construction locations and transported scaffolding materials
  • Heavy lifting, work effectively in teams, prepare jobs, make sure job sites clean, working safely and efficiently, prepare Job Safety Analysis
  • Erected and dismantled scaffolds
  • Worked 12-16 hour shifts

scaffold builder

  • Assisted scaffold builder
  • Obtain permits when required
  • Material data sheet
  • Shut down jobs if consider unsafe conditions abound
  • load and unload Material
  • Always keeping a watchful eye on coworkers and making sure they are working safely
  • Worked as a helper and advanced to a carpenter in just under a year

scaffold builder/insulator

  • Performed duties of a scaffold builder/leadman which included, but was not limited to, scaffold erection and demolition. 
  • Measured the size, and material needed for the scaffold that was needed to perform a specific task.
  • Along with scaffolding, I worked as an insulator’s helper, where we worked alongside inspectors and operators. .
  • I read blueprints and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
  • I was required to measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
  • I learned to cover, seal, and finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
  • Measured and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.

scaffold builder

  • Heavy lifting, work effectively in teams, prepare jobs, make sure job sites clean, working safely and efficiently, prepare Job Safety Analysis paperwork
  • Able to recognize hazards and find ways to mitigate those hazards
  • Modify scaffolds
  • Responsible to make a safe work site for the team, such as barricading the areas and begin aware of any potenital hazards such as slips, trips, and falls