  • Erect or dismantle scaffolding, shoring, and braces.
  • Provide assistance to craft workers, such as carpenters, plasterers, or masons. 
  • Place and tie rebar and wire mesh
  • Build and remove wood and metal forming
  • Signal crane 
  • Level coatings using proper miliage 
  • Push and Rollering multiple different kinds of painting material

concrete finisher

  • Poured and finished concrete
  • Mechanical work on dirt late models
  • Cleaning and upkeep of equipment 
  • Sand blasting 

concrete finisher

  • Operate forklift and bobcat to transport or position large parts.
  • Grout work.
  • Grinding to remove excess concrete
  • Ensuring pieces are ready to ship
  • Keeping a clean and tidy site
  • Fast paced environment, hard labour

concrete finisher

  • Work quickly in a physically demanding, fast paced and challenging environment. 
  • Carry out all job requirements quickly while adhering to plans and safety regulations. 
  • Perform both structural and flat poured concrete work.
  • Read and follow blueprints and schematics.

concrete finisher

  • Measure and mark unlevel concrete flooring.
  • Mix and apply concrete leveler.
  • Operate and maintain Terrco floor grinders.
  • Grind and polish concrete with a hand held grinder.
  • Mix and apply epoxy resin flooring.

concrete finisher, crew leader

  • Perform other duties as assigned by the General Manager / Operations Manager
  • Assist with assigning, directing, and monitoring, the work of all team members
  • Monitor the crew and make operational adjustments to reach short term goals
  • Work with other department managers to keep operation running efficiently and smoothly
  • Train provide direction and/or assistance, answer questions and monitor the work of loaders 
  • Can operate a fork lift 

concrete finisher/lead/translator

  • Set the forms that hold concrete to the desired pitch and depth, and align them.
  • Check the forms that hold the concrete to see that they are properly constructed.
  • Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
  • Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
  • Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
  • Produce rough concrete surface, using broom.
  • Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.

concrete finisher

  • Read prints 
  • Layout floors,driveways, sidewalks, walls, curbs, parking lots, etc. 
  • Set elevations and operate laser leveling equipment 
  • Built, set, and pulled forms of all different types 
  • Figured square footage and yardage of cement needed for job 
  • Packed dirt with tamper 
  • Graded dirt with shovel prior to pouring. Also dug footers with shovel and pick axe.  

concrete finisher

  • Setting forms
  • Cutting and tying rebar
  • Spreading, leveling and finishing concrete
  • Use of hand and pole tools
  • Read prints and direct team when necessary

concrete finisher/heavy equipment operator

  • Load and move dirt, rocks,  or other materials, using trucks, bulldozers, trench excavators, road graders, or backhoes.
  • Tied steel and cut wire for slabs 
  • Operated concrete mixers chute 
  • Poured, leveled, and bull floated wet cement