Andrew Smith

287 Custer Street, Hopewell, PA 00000
(000) 000-0000

Professional Summary

Self-motivated individual with excellent interpersonal skills. Ability to adapt and learn quickly in a fast moving environment. Extreme attention to detail with experience in high stress job situations. Always willing to take on more responsibility and help those who need it by providing training in an individual communicative manner.   

Employment history

Cement Mason/ Lead Finisher/ Foreman Trainee, Kling Group. Funkshire, Alaska
May. 2018 – Present
Smooth and finish surfaces of poured concrete, such as floors, walks, sidewalks, roads, or curbs using a variety of hand and power tools. Align forms for sidewalks, curbs, or gutters; patch voids; and use saws to cut expansion joints.
Responsible for opening and locking up shop. Completed daily reports consisting of daily job descriptions. Lead finisher and inspector of 10 employees. Driver. 
Heavy Equipment Operator, Simonis, Rohan and Prosacco. McKenzieberg, Virginia
Mar. 2015 – Aug. 2016
Operating heavy equipment such as back-hoes and bulldozers, excavators, scrapers, loaders, rock crushers to move or place equipment or materials. Inspecting, cleaning, lubricating and refilling equipment.


Lead Installer, Welch-Nitzsche. Lake Carrol, Louisiana
Jun. 2013 – Nov. 2013
Install and disassemble scaffolding up to 10 stories for construction projects. Read job plans to prep crew for each job. Managed supplies and crew to complete job.

Education

Western Arkansas College, Ortizport, Tennessee
High School Diploma, High School, Jul. 2006

Skills

Heavy Equipment Operator
Carpentry
Cement Mason
Hydraulic Mechanic
Auto Mechanic
Trainer
Managerial

Not in love with this template? Browse our full library of resume templates

boy

Build your resume in 15 minutes

Use professional field-tested resume templates that follow the exact resume rules employers look for.

More Job Descriptions for :

1

cement mason/ concrete finisher

  • set up stakes and lay down 2×4 around area where cement will be poured 
  • measure and precisely mark sides to the required height the cement should be poured to
  • pour wet cement while using a cumalong to create an even surface 
  • use trowels and screeds to give the concrete a finish 
  • always communicate well with the team to work safely and efficiently 
  • clean all the supplies well and load them properly back into the work truck