resume

Not in love with this template? Browse our full library of resume templates

boy

Build your resume in 15 minutes

Use professional field-tested resume templates that follow the exact resume rules employers look for.
1

pipe layer

  • Directed equipment operators and alerted them to hazards by using effective hand signals.
  • Handled the assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Assessed pipes to ensure that there were no leaks and they were functioning correctly.
  • Adhered to all company equipment policies and safety procedures to avoid accidents and mishaps. Assisted large crews in erecting, repairing and the wrecking of buildings and bridges.
  • Used a pick and shovel to dig, spread and level dirt and gravel.
  • Installed and repaired roofs, flashings and surfaces.
2

pipe layer/labourer

  • Digging using a shovel and mattock.
  • Using an earth compactor.
  • Directing bobcat operators when back filling trenches.
  • Working as a part of a very large team, including other labour hire companies.
3

pipe layer

  • Adhered to all company equipment policies and safety procedures to avoid accidents and mishaps. Assessed pipes to ensure that there were no leaks and they were functioning correctly.
  • Used grouting trowels to apply grout between joints of bricks and tiles.
  • Assisted with project and site-related objectives, including acquisition, operating financing, financial controls, systems integration, and audits.
  • Picked, packed, received, and restocked products with forklift, lift truck and stock picker.
  • Assisted large crews in erecting, repairing and the wrecking of buildings and bridges.
  • Maintained tools, equipment and work sites.
  • Mixed and laid concrete to raise top of manhole to the street level.
4

pipe layer/laborer

  • Oiled and cleaned machines and added coolant to machine reservoirs.
  • Cut, fit, and welded metal components, including plate, structural shapes, and pipe.
  • Cleaned all construction areas to avoid hazards.
  • Cut materials to specified sizes for installation using power saws and tile cutters.
5

pipe layer

  • Cut pipe
  • Shoot grade
  • Backfill
  • Concrete inverts and collars
  • Lay  pipe