resume

Not in love with this template? Browse our full library of resume templates

boy

Build your resume in 15 minutes

Use professional field-tested resume templates that follow the exact resume rules employers look for.
6

it director/ceo

  • Installed and configured FortiAP access point with Fortigate Access controller with NPS server authentication (User+Mac based auth).
  • Installed and configured trusted root certificates services for Wireless security.
  • Software license/hardware inventory reports and Involved in Third-party IT audit.
  • Worked on Symantec Backup Exec for taking backup in LTO5/LTO7 tapes.
7

it director

  • Leading a build and run 25-man team to manage Singtel CRM applications systems
  • Developing in-sourcing model to support current and new boarding systems
  • Plan and manage projects and change requests to deliver within approved business case in context of scope, cost and schedule
  • Budgeting and cost optimization to achieve stretch
8

it director

  • Vendor management and negotiation.
  • Worked on the virtualization platform (Vmware, Virtualbox).
  • Installed and Configured Apache+PHP+PHP myadmin+Mysql server for internal production management system with redundancy build (Mysql master replication with rsync copy for webroot) using Centos 6.5.
  • Installed and Configured GLPI for IT ticketing system and with OCS integration for network and system inventory.
9

it director/ project manager

  • Project Manager for Fuji software and hardware upgrades
  • Project Manager for Fuji converted to VMWare 
  • Project Manager for the implementation of a Fuji Supported Disaster Recovery Plan
  • Project Manager for the implementation of IDS New Dictation System
  • Project Manager for the implementation and replacement of new Digital Mammography units.
  • Project Manager for the design and implementation of a new Server room and the upgrading of existing server room.
  • Project Manage for the implementation of Cisco Unified Communications System
10

it director (dream park)

  • Installed and configured E-group ware for production management.
  •  Installed and configured Perforce version control for Electronics Arts.
  •  Installed and Configured Virtual Vertex Muster scheduler engine for HPC.
  •  Installed and configured Openfire server with integration with in-house production management system to get automated alerts.