resume

Not in love with this template? Browse our full library of resume templates

boy

Build your resume in 15 minutes

Use professional field-tested resume templates that follow the exact resume rules employers look for.
1

field engineer (based aeon melaka)

  •  Work at Aeon Retail Company located at Melaka as Field Engineer
  • Daily Health check on Server’s,Network Peripherals,all Pos system
  • Support Aeon staff with IT problem
  • Install New Pos System,New Workstation for user’s
  • Maintain IT services with SLA given
  • Coordinate and Setup Networking environment for as per request
  • maintain closely on Server’s update
2

field engineer

  • Responsible for site operations, implementation, structural, and related civil works (Rebar works, Concreting works, Painting works, Formworks).
  • Supervise and ensures proper work execution in accordance with the approved structural plans specifications.
  • Coordinate structural, civil works of subcontractor and other technical works
  • Prepare submittals and the shop drawing, Request for Information and other related field drawings and documents
  • Check and monitor daily progress on site ,preparing material request forms and managing site workers.
  • Responsible on preparing Inspection Work Request, Permit to work on site, Weekly Report, Daily Report, Site Inspection and initiate site instructions to workers/leadmans/foremans.
3

field engineer

  • Establish, monitor, maintain and update construction work schedules.
  • Level 1 support on Server’s side
  • Install and configure new Pc’s ,Laptop’s,Printers
  • Preventive Maintenence on all IT peripherals 
4

field engineer

  • Performed Preventative Maintenance on multiple brands of UPS systems.
  • Alber and Midtronic battery testing on VRLA and wet cell battery strings.
  • Removal and replacement of VRLA battery strings.
  • Start-up and training on Tripplite three phase UPS systems.
5

field engineer

  • Gas Turbine Frame 6B, Make BHEL, Capacity 33.75 MW, Total 4 Turbine (Fuel–Natural Gas, HSD & Naphtha)
  • Utility Boiler 220TPH. Total 2 Boiler(Fuel – Natural Gas, Complex Gas & Naphtha)
  • Test performance of electro-
  • Conduct or supervise the installation and operation of electronic equipment and systems.mechanical assemblies, using test instruments such as oscilloscopes, electronic voltmeters, or bridges.