  • Prepare the first budget of the project and cost baseline includes the project’s WBSs with the distribution of the budget of each WBS and each activity.
  • Monitoring and controlling the actual cost and the committed cost of sub-contractors, supplied materials and manpower against the take-off quantities and approved budgeted unit rates in the budget.
  • Tracking all approved changes notices and updating the cost baseline and the Project budget.
  • Assisting in Providing monthly cost report with periodically calculation of estimate to complete and tracking cost performance index and schedule performance index using earned value technique.
  • Report to the cost control manager the deviation reasons from the cost baseline. 
2

cost control engineer

  • Directly reporting to the Project Manager and CHQ-MPE Quarry Manager. 
  • Prepare detailed daily, weekly and monthly production and accomplishment report that will provide sufficient information to Project Management Team and the Corporate on the productivity of the project. 
  • Compare operation’s productivity against the target set and agreed by the Project Management Team and Engineering and provide recommendations on ways to improve the project’s overall output. 
  • Prepare periodic report and production summaries as required by the Client. 
  • Coordinate closely together with the Client’s Engineering Team regarding the weekly and monthly production target. 
  • Prepare Quarterly, Monthly and Weekly mine plans which will be presented to the client. 
  • Prepare billing statement for the production total material moved (raw materials). 
3

cost control engineer

  • Maintain and record update of site work progress obtained from Project Manager.
  • Prepares monthly report reflecting work progress summary.
  •  Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
  • Participate in project meetings and discussions with the Client as required.
  • Assists in preparing work program, cash flow and manpower histogram for tenders.
  • Provide and gather all the required technical documents such as drawings, manuals and instructions for construction team.
  • Conduct quantity surveying for all executed work.
4

senior cost control engineer

  •  Prepare the cost report on regular basis reflecting the project cost status.
  • Review all direct costs posted and analyze project expenses by trade and compare it to budget. 
  •  Monitor the status and actual cost for labors, equipment, subcontractors and committed cost .
  •  Preparing actual productivity sheets and curves for budget comparison.
5

cost control engineer

  • Monitor and prepare billing for equipment rental. 
  • Prepare third-party billing.
  • Prepare and follow-up the documentation for claims and variation order .
  • Take part in selection process of subcontractors and suppliers for projects.
  • Reviewing subcontractors’ invoices .
  • Work Shop Drawings And As Built Drawings .