piping engineer
- Responsible for verification of isometric drawings (P&ID).
- Preparation of mark-up drawings during constructionconstruction
- Interdisciplinary design coordination
- Stress Analysis
- Reviewed drawings and delivered inputs as ATA2 – Responsible engineer role for piping design through Assai System.
- Prepared Materials Summary (BQ/BOM) and estimated Cost for pipes/fittings/valves etc.
- Liaised with other disciplines, project personnel, departments, vendors, etc., and ensured all interfaces to other disciplines are clearly defined and correctly engineered.
piping engineer
- Construction supervision of all activities to ensure that the project meets the detailed engineering drawings, specifications i.e. Welding, Sand Blasting, Painting, NDT, Hydro-testing, Flushing according to Codes & standards i.e. ASME-Sec IX, API 653, API 650, SA 2.5, SSPC 10, API 1104, NACE Procedure, Quality Inspection Plan and Project Specification.
- Supervision and Inspection of erection and assembling of equipment’s, Fabrication work, Steel Structure, Piping and Tanks at Work shop and Site.
- Project planning, co-ordination with Contractor and Progress monitoring of Construction works.
- To ensure traceability of engineering design decisions.
- FAT / SAT of the equipment and piping bulk material.
- Maintaining updated revisions of project drawings, specifications and project correspondence.
- Project progress reporting and participation in weekly/monthly meetings.
piping engineer (internship trainee)
- Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
- Developed manufacturing drawings and oversaw teams of technicians in construction of systems.
- Sketched outline designs and used CAD programs to create detailed design and specifications.
- Read and interpreted blueprints and created engineering drawings and sketches.
piping engineer
- Equipment and Piping Modeling in PDS.
- Creating and maintaining project schedules.
- Drafting P&ID in Auto-CAD and SPP&ID.
- Documentation of the entire project.
- Soft QC and hard QC of P&ID.
piping engineer
- Involved in all project phases from the conceptual design to the start-up.
- Conducted site survey and studied feasibility of equipment, valves, piping etc. on site with project team.
- Prepared equipment layout plan, drawings, and material specifications.
- Developed new pipe support design standards for Design Department.
- Identified stress critical lines from P & ID and line data.
- Performed piping stress analysis and selection of pipe supports.
- Reviewed of Caesar II reports and ensured work is carried out with relevant codes, standards and procedures.
piping engineer
- Site Planning, site assistance, monitoring, Quality Control and Material Procurement.
- Identification of Piping Loops & maintaining loop file records for NDT, Hydro testing, Mechanical Clearance and Final Box Up.
- Preparation of Daily, Weekly & Monthly progress Review Reports, MIS and updating actual against projection on a Daily, Weekly and monthly basis.
- understan Study & Study & Study & Study & Study & Study & Study & Study & understand scope of work, Interpretation of Project specifications.
piping engineer
- Creation of spec database in PBOMS(in-house software)
- Estimation of MTO and checking of the same.
- Quality checking of site deliverables like Piping Isometric drawing,
- Piping GAD’s and stress Isometrics
- Pipe support checking of the given tank-farm area.
- Preparation of Piping Material Specification
- Review vendor drawings, documents and design calculations
piping engineer
- MOre than 11yrs experience as a piping engineer in a single organisation L&T- Chiyoda, helped me to understand systems and procedures in piping engineering and more towards managing the same
- Attended many courses to broaden my technical knowledge & understanding on the roles I was currently undertaking. I have done level-2 in NDT in LP testing and MP testing and successfully completed welding inspector course from IIW and proficient in reading WPS and PQR
- Experience through my employment at L&T-Chiyoda, including site deputation of one of the biggest project OMPL-Mangalore. Have knowledge of managing different activities till commissioning and start-up
- Presently working as an area lead Engineer on the TGAP proposal Project, managing a fairly new team, new joiners, training them in on job and managing Project with different departments
piping engineer
- Preparation of piping registration packages and data books.
- Hands on experience in preparing technical specifications, material selection,preparing data sheets, sizing, selection and performance evaluation of oil and gas industry equipment’s.
- Inspection of Hydro test for Piping packages, Light test for ducting & Chiller packages installation & commission.
- Reviewing of Piping Drawings (GAD, Schematic)
piping engineer
- Erection of 32 Ton banbury in MRF rubber plant, pondicherry
- Installation of packing stacker in APOLLO TYRES pvt ltd.Perambra 16 Ton machine
- Utility, compressor area, junior designer.
- Ensured design reflected with P&ID.
piping engineer
- Preparation of Material Take-Off
- Performing various calculations i.e. Wall thickness, Highway & Railroad Crossing, Anti-Buoyancy, HDD etc
- Preparation of Material Requisition for various deliverable
- Preparation of various datasheets pertaining to Valve’s, Flow Tee, Insulating Joint, water monitor, water hydrant etc
- Prepare cost estimate for piping items and develop bid evaluation criteria subsequently
- Preparation of Procurement & Construction tender
- Evaluation of Tender documents and preparation of Technical Bid Analysis (TBA)
piping engineer
- Evaluate and carefully consider the building pipes are to be installed in.
- Interact with clients, answering questions and collaborating to meet expectations.
- Create blueprint and provide information for construction crew to begin working efficiently.
- Oversee all piping aspects of construction, delegating tasks and identifying areas in need of improvement.
- Install pipes personally, putting standard contracting practices to use.
- Maintain client satisfaction rate above 90 percent throughout career.
piping engineer
- Site Planning, site assistance, monitoring, Quality Control and Material Procurement.
- Coordinating Area wise Planner, Site Engineers on daily basis. Planning for future fronts for execution and make sure commencement for project as per plan.
- Identification of Piping Loops & maintaining loop file records for NDT, Hydro testing, Mechanical Clearance and Final Box Up.
- Preparation of Daily, Weekly & Monthly progress Review Reports, MIS and updating actual against projection on a Daily, Weekly and monthly basis.
piping engineer
- Would prepare layout drawings on AutoCAD according to site and give for fabrication.
- Was responsible for layout design for pipe sizes below 2.5”.
- Studying and checking of P&Id’s and Isometrics of drawings and fabricating accordingly.
- Responsible for the complete Fabrication,Erection,Testing of all the piping systems .
piping engineer
- Involved in General Arrangement Drawing, Piping and Instrument Diagram, Isometrics Drawing, Fabrication Drawing and structural/support Drawing.
- Ensuring and delivering the quality service within the set time and budgeted costs as per standard and specification of the customer.
- Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
- Excellent relationship management, communication skills with the ability to network with the project member’s consultants, contractors and customer with consummate ease.