petroleum engineer

  • Supervise of all slick/wireline operations such as Perforation, Logging, Gas lift valves change out, SCSSV changes out, Set/Retrieve Bridge plugs, gauge cutter and impression block. 
  • Supervise ESP completion installation, keep ESP wells (20%+ H2S concentration) working in good performance and troubleshooting.
  • Attend ESP tear down inspection and preparing dismantle evaluation reports.
  • Supervise gas-lift wells completion running, testing, unloading, troubleshooting & gas volumes optimization.
  •  Follow-up and supervise/witness the implementation of monitoring surveys. 
  • Well performance monitoring, evaluation, reporting and statistical. 
  • Well Completion design and supervise its installation. 

petroleum engineer

  • Write technical reports for engineering and management personnel. 
  •  Received active coaching and mentoring 
  • Interact with different teams (Drilling, Processing, Reservoir Engineering, Materials, and Contracts). 
  • Supervise of all Coiled Tubing pumping operations and arrangements such as Isolation using retrievable bridge plug, Acid Stimulation, Nitrogen lifting, Perforation and logging 

petroleum engineer

  • To utilize problem-solving skills and project management in overseeing the drilling operation. 
  •  Provide engineering support in the planning, execution, and completion of drilling projects. 
  • Deliver Engineering & safety knowledge sharing presentation to senior management. 
  •  Conducted feasibility assessment studies for developing new oil and gas fields 

petroleum engineer

  • Supervise Pressure Build-Up, Static-Flowing P-T and gas-lift survey including jobs planning, considerations, supervision and Carrying out the related calculation. 
  • Witness Corrosion logs jobs and analysis. 
  • Perform Production logging interpretation and cement evaluation. 
  • Supervise water and gas shut-off jobs. 
  • Supervise perforation jobs either rig or rig less in addition to Jobs arrangement and safety considerations 
  • Supervise pulling the problematic completion of ESP well, change it and re-complete it again. 
  • Supervise completion tally running and testing, completions cutting and fishing, Setting bridge plugs, CMT plugs, and packers to achieve petroleum engineering objectives while meeting environmental and safety standards 

petroleum engineer

  • Managing & Planning upcoming projects.
  • Helping compnay for established an integrated drilling services & international operation (Iraq , Egypt & Ethiopia).
  • Economic models for new coming project or current one.
  • Deal with all ITBs and prepare a Technical proposalfor it.
  • Technical Support of all upstream going projects.

petroleum engineer

  • Worked on a Research project on GEOCHEMICAL PROSPECTING OF CAMBAY BASIN . 
  • Researched and compiled information and data on Geochemical Prospecting , gathered information from peer-reviewed journals and other digital resources.
  • Created weekly and monthly reports and presentations.
  • Strengthened organizational behaviour, developing organization systems for records, reports and agendas in a professional way