construction/ painter
- Installed cabinets
- Installed hardwood flooring and bathroom tile
- Painted cabinets, brick, and vinyl siding
- Installed outside walk ways for houses
construction
- Install marbles and cut gas pipe whole etc.
- Demolishing and cleaning up existing structures.
- General Highway construction including:
- Cover sub-floors with building paper to keep out moisture and lay hardwood, parquet, or wood-strip-block floors by nailing floors to sub-floor or cementing them to mastic or asphalt base.
construction
- Reviewed the arrangement for purchases under a budget on construction resources found in convenient stores.
- Learned how to responsibly gather the needed construction resources
- Heavy lifted equipment and materials such as wood.
- Handled tools by coordinating them to a construction partner
- Prepared and organized tools ahead of time, while maintaining a clean working space
- Efficiently handled sawing wood to according measurements
- Followed safety instructions accordingly
construction
- Lifting wooden stencils and placing them on pavement.
- Setting cones.
- Filling paint machines.
- Cleaning inside of barrel used with paint machines.
- Scraping paint off wooden stencils so as to clean them for next use.
- Measuring and laying out chalk lines.
construction
- Working with heavy machinery for building construction
- Measured units for proper cutting
- Clean-up of work/construction area
- Demolition for new construction area
- Use of tools in work area
construction
- Applied caulk, sealants and other agents to installed surfaces
- Consistently assumed additional responsibilities and worked extended hours to meet project deadlines
- Set ladders, scaffolds and hoists in place for moving supplies with safety
- Operated equipment such as SkyJack and Swing Stages
- Removed damaged tile, brick and mortar
- Worked with many employees and successfully completed projects
construction/merchandiser
- Read and edited planograms so the company in question could use it for merchandising.
- When needed was gladly willing to stay after with the team to get a specific job done correctly.
- Was contract based and finished the job a month earlier than expected.
- Understood that my job needed a flexible set of skills and was willing to learn on the job.
construction
- Supply or hold tools and materials.
- Operate motorized pumps to remove water from flooded manholes, basements, or facility floors.
- Operate sewer cleaning equipment, including power rodders, high velocity water jets, sewer flushers, bucket machines, wayne balls, and vac-alls.
- Ensure that repaired sewer line joints are tightly sealed before backfilling begins.
construction
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers’ wishes.
- Mold or install ornamental plaster pieces, panels, or trim.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Mix plaster, and carry plaster to plasterers.
construction
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
construction
- Apply shock-absorbing, sound-deadening, or decorative paneling to ceilings or walls.
- Bore boltholes in timber, masonry or concrete walls, using power drill.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
construction
- Apply a sealer to make grout stain- and water-resistant.
- Test atmosphere for adequate oxygen or explosive conditions when working in confined spaces.
- Push other equipment when extra traction or assistance is required.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Operate machines to flush earth cuttings or to blow dust from holes.
- Disinfect, reconstruct, and redevelop contaminated wells and water pumping systems, and clean and disinfect new wells in preparation for use.
- Select or develop mineral location, extraction, and production methods, based on factors such as safety, cost, and deposit characteristics.
construction
- Haul and spread sand, gravel, and clay to fill washouts and repair road shoulders.
- Dump, spread, and tamp asphalt, using pneumatic tampers, to repair joints and patch broken pavement.
- Remove litter and debris from roadways, including debris from rock and mud slides.
- Clean and clear debris from culverts, catch basins, drop inlets, ditches, and other drain structures.
construction
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Roof work
- Interior/Exterior Painting
- Secure metal roof panels in place, and interlock and fasten grooved panel edges.
construction
- Control traffic passing near, in, or around work zones.Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.
- Assemble and fasten material together to construct wood or metal framework of structure, using bolts, nails, or screws.Profiling of buildings
- Install a
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.nd anchor fixtures in designated positions, using hand tools.
- Mix, pour, or spread concrete, using portable cement mixer
- Cut metal or wood framing and trim to size, using cutting tools.
- Remove old insulation such as asbestos, following safety procedures.
construction
- Spray or spread refractory material over brickwork to protect against deterioration.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Attach parts or subassemblies together to form completed units, using glue, dowels, nails, screws, or clamps.
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.