assistant engineer

  • Project Scheduling, Execution Planning
  • Preparing Daily Progress Report
  • Operations and Maintenance of the entire City Gas network of Steel Pipelines and MDPE Pipelines.
  • Operating controlling panel  

assistant engineer ( retd)

  • block panchayath and district panchayath palakkad. Preparation of estimates and drawings, supervision . measurements taken , bill preparation, etc.
  • Inspect work sites and give OK for works from quality control point of view and sign the approved forms and maintain records. 
  • Carry out mix design of concrete and shotcrete in collaboration with the contractor representatives. 
  • Monitor site work and make sure it is been done according to approved designs. 

assistant engineer

  • Individual structures done like Clubhouse, Podium bridges , Ramps and Residential Building structures
  • Coordinating Skills
  • Preparing daily shedules
  • BBS and Billing
  • Subcontractor billing and Reduce production cost upto 20%
  • Conventional and mivan shuttering
  • Done A godown structure with individually

assistant engineer

  • Ability to produce technical specifications, Producing construction methodologies, Health and Safety awareness, Knowledge of budgeting and the financial monitoring of projects, Competent in the use of survey equipment. Experience of water retaining structures etc….
  • Review product designs for manufacturability as per the data provided by the client.
  • Costing & Estimation of the desired product.
  • Getting approvals for the sent drawing

assistant engineer

  •  Oversee and ensure that all sampling and testing jobs are carried out as per the ITP, specification, standards and best practices.
  • Ensure that all laboratory and field testing equipment established by contractor are functional, calibrated from time to time and maintained properly at all times. 
  • Carry out field testing and NDTs as and when required and instructed by the head of division. 
  • Carry out calibration of batching plants from time to time and prepare reports. 
  • Prepare test reports as per approved formats and sign on regular basis. 
  •  Do data analysis, interpretation and state conclusions on test reports and submit to the head of division on regular basis. 
  • Move around all assigned work sites for visual inspection and observation with regard to quality control and report any shortcomings, defects, malpractices, substandard works, substandard workmanship and substandard materials found at sites and implement corrective/remedial measures as soon as possible. 

assistant engineer

  • Designing & modifying of power & control panel (Electrical & Instrumentation). 
  • Maintenance, operation & calibration of various types of AC/DC drives, PID digital controllers, valves (Pneumatic, Electronic & solenoid types), transmitters (Pressure, Level, temperature, consistency, flow & etc)  and various types of electrical & instrumentation equipment. 
  • Controlling & troubleshooting of DCS, paper scanners (Honeywell, JASCH), air compressor & all types of relay logic controls.
  • Designing, modifying & troubleshooting of Instrumentation related Hydraulic & Pneumatic systems.
  •  Designing, controlling & maintenance of PFI panels, HT/LT switch gear panels.
  • Responsible for supervising and coordinating erection and commissioning in all Electrical & Instrumentation sides.
  •  Maintenance, supervising & troubleshooting in my regular work.

assistant engineer

  • Developing the structural design of products using drafting tools or computer-assisted design (CAD) of Fire Rated Fully Glazed Doors.
  • Estimate costs and submit Quotations for Fire Rated Fully Glazed Doors. 
  • Install the telephone signal in the control room
  • Cut the phone signal

assistant engineer

  • Working as an Assistant engineer for BRGF Project work under NBPDCL in Araria District (Bihar)
  • Installation and erection of 33KV/11KV outdoor Sub-Station .(Such as 11KV/33KV VCB,Isolator,Power Transformer etc.)
  • Co ordinating in 33/11KV S/S as per aspect (Equipment marking and Erection).
  • C&R Panel board erection, Switch Yard mounting, detailed earthing of S/S .
  • R&M Work of 11/33KV Outdoor Sub-Station.
  • Estimation & Verification of Contractor’s bills.
  • Reconciliation of Materials.

assistant engineer

  • Inspect completed installations and observe operations run smoothly as specifications and design are compliance with operational and safety standards.
  • Modify, maintain and repair electronics equipment and systems to ensure that they function properly.
  • Organized student plotting.
  • Operate office equipment, such as fax & photocopy machines or phone systems and arrange for repairs when equipment malfunctions.

assistant engineer

  • Interpret engineering drawings, schematic diagrams, blueprints, technical drawings or formulas and confer with management or engineering staff to determine quality and reliability standards.
  • Involved in Petronas Reliability Based Inspection
  • Assist the Senior Technician for project ‘site verification’ at Penfiber Sdn Bhd, Bahru stainless Sdn Bhd and RAPID Pengerang project.
  • Assist senior UT operator for thickness measuring project.
  • Project leader for thickness measuring Project RAPID Pengerang for LLDPE plant.
  • Plan and establish sequence of operations to face issues at site.
  • Conduct project team to analyzes the feasibility, design, operation, or performance of equipment, components, or systems.

assistant engineer (shift in-charge)

  • Led preventive and breakdown maintenance of Steel melting shop as Induction furnace, Ladle refining furnace, Overhead crane, APC and WTP.
  • Lead hydraulic and pneumatic troubleshooting.
  • Lead pump and compressor troubleshooting.
  • Maintain the operating condition of industrial production or processing machinery or equipment.

assistant engineer

  • Communicate with telecommunications sub-Contractors to obtain pricing and technical specifications for available hardware, software, or services.
  • Performed drive tests.
  • Optimized cluster reports & SSV (Single Site Verification) reports.
  • IBS (In Building Solution) performance & equipment handling 

assistant engineer

  • Raising work order to contractors/Vendors.as per their network up gradation.
  • Integral part of Transmission – Performance Management & Problem Management team  
  • Monitoring, analyzing, and troubleshooting all Transmission Related activities.  
  • Planning the path as per customer’s requirements, sending ASR’s for the new path and then after approval, coordinating with the field engineers for successful migration.
  • Field support to the customer End and assigning Task to field Engineer.  

assistant engineer

  • Chiller and AHU
  • Cooling Towers 
  •  Air Compressors 
  • Air Dryers 
  • Water Treatment Plant 
  • Pumps etc. 
  • Designing preventive maintenance strategies, procedures & methods. 

assistant engineer

  • Confer with engineers to discuss existing or potential engineering projects or quality improvement at Die Bonder & Wire Bonder machine.
  • Assist in quality improvement project activity for new equipment or major repairs.
  • Educate equipment operators or technician on the proper use of equipment or work flow to prevent and improve quality in production.
  • Evaluate machine or process control requirements to improve quality or controller specifications suited to operating Die Bonder & Wire Bonder machine.

assistant engineer

  • Write technical reports or other documentation, such as Acceptance Test Plan, Work Instruction and some basic Harness fabrication drawing.
  • Conduct training or in-services to educate staffs on proper use of techniques such as IPC 620A and IPC 7711/7721.
  • Conduct testing such as PCBA level test, ebox level testing and conducting of factory acceptance testing .
  • Military Harness specialist  
  • Consolidate BOM, sourcing for suppliers and handling suppliers and customers. 

assistant engineer

  • Assist artists and engineers in creating high-quality, commercial recordings. Work includes setting up equipment, checking status of recording, and giving opinions on technical issues.
  • Interact closely with artists and helping them to create the sound they want. 
  • Solve technical and other issues in the studio. 
  • Playing backup parts for professional records.

assistant engineer

  • Review final layouts of development plan and suggest improvements as needed.
  • Inspect project sites to monitor progress and ensure in accordance with the approved plan that issued  
  • Attending meeting and value management laboratory for Government projects.
  • Respond to requests for information from the public and other government agencies. 

assistant engineer

  • Participate in the administration of preparation of memorandum, local plan and any related with planning control.
  • Coordinate work with architects during the formulation of plans or the design of large pieces of infrastructure.
  • Record and edit the minutes of meetings for City Planning Committee meeting.
  • Recommend approval, rejection, or conditional approval of proposals.
  • Provide technical advice on the development plan.
  • Approve and sign plans that meet required specifications. 
  • Review and evaluate environmental impact assessment reports pertaining to private or public planning projects.

assistant engineer/procurement

  •  Assisted in Periodic Review of designs and reports and outputs of consultants and contractors.
  •  implemented projects at all levels – selection, appraisals, engineering designs, tendering, and works execution to completion. 
  •   Lead community sensitization and capacity building groups with stakeholders, in line with project objectives 
  •  Facilitated the involvement of the beneficiary communities in the development of feeder Roads, Dams and climate change activities in the area. 
  •  Prepared monitoring reports according to defined methodology and scheduled and contribute to development of Donor report 
  •  Supported the identification and tracking opportunities for new projects in the communities 
  •  Prepared, managed, updated and monitored procurement plans, annual work plan  procurement audits, preparation of TORS, RFPs, Tender docs, GPN, EOIs, Initiate adverts, supervise evaluations of proposals and tenders etc.), Preparation of Contracts etc. and monitor contracts delivery 

assistant engineer

  • Working on various projects regarding the overall planning and design of mechanical systems
  • Assisting in creating two-dimensional construction documentation using CAD software
  • Organizing and maintaining project files 
  • Test soils or materials to determine the adequacy and strength of foundations, concrete

assistant engineer

  • Participated in embeded system design (Microcontroller type: MSP430) for high water level detection system.
  • Drafted assembly drawings of oil drilling derricks with CAD.
  • Good knowledge of RPA Life Cycle. 
  • Report Generation. Management of project analysis & Team coordination. 

assistant engineer

  • Hands on Experience in Data Extraction from Excel on daily basis in Blueprism. 
  • Experienced with Process bots, Object bots creation controlling and deploying. 
  • Worked on PDF migration, Excel migration, windows and web automation (BP). 
  • Worked on EMAIL, pop3, outlook configuration bots (BP). 

assistant engineer (rpa developer- blueprism)

  • 2+ years of overall experience in a Telecom Industry.  
  • 1+ year of Experience in Robotics Process Automation(RPA) using one of the top Robotics Process Automation (RPA) tool Blueprism. 
  • Knowledge of UIPath UIPath Studio. (Learning Continue).  
  • Adopt in Robotics Process Automation from requirement gathering, solution designing, testing, debugging, documentation and implementation. 
  • Blue Prism Developer Responsible for end to end design and development.  
  • Experience in Managing Robot Workload using Blueprism WorkQueue. 
  • Hands on Experience in Documentation(PDD,SDD,TDD)

assistant engineer (process)

  • Responsible for implementing and maintaining the Quality management system for Estimation work.
  • analyzing and interpreting data. 
  • Provide feedback to design engineers on problems or needs.
  • Estimate costs and submit bids for engineering, or extraction projects, and prepare contract documents.

assistant engineer

  • My tasks included the repairs, maintenance and installation of marine equipment such as radars, GPS and VHF communication equipment. 
  • To coordinate with client for repairs of vessels.
  • Keep track of inventories/parts  used for repairs of ships.
  • Attend meetings, trainings as schedule or organised by management.

assistant engineer

  • Performing job tasks based on a regulated preventative maintenance program.
  • Preparing technical reports for use by engineering, management, and client personnel.
  • Conducting environmental, operational, and performance tests on engine room specific machinery and equipment.
  • Troubleshooting malfunctioning equipment or systems and proper repair of such.

assistant engineer

  • Preparing Qualifications, Assumptions and Exclusions if any.
  • Prepare value engineering.
  • Attend Pre-Bid Tender Meetings and site visits.
  • Assist to estimator and quantity surveyors.

assistant engineer

  • Responsible for keeping the ships maintenance log updated.
  • Pricing material and lobor cost of each BOQ item in the price comparision sheets, by using the quotations and a pre-determined rates.
  • Preparing Price comparision sheet for each system and final cost summary
  • Check all the addendums and communications received from the client, ensuring that all items are being clarified and considered in the pricing.

assistant engineer

  • Research, Evaluate, Installation, Operate, and maintain  Automotive  Emissions and Engine Test systems and processes to meet requirements, applying knowledge of engineering principles.
  • Was responsible for carrying out Test and operate emission devices such as AMA Emission Analyzer , Micro soot sensor , FTIR (Diesel BS-6 Testing) APC (Advance particle counter for PN detection. ) 
  • Commissioning of the RDE -PEMS (AVL) on for small (800cc)  passenger car for correlation uncertainty.
  • RCA activity for the problems faced by OEMS Test Facility.